Waterwatch Data Portal
MA_EWW100 Horseshoe pump site - Site 2
8 September 2012
Site visit details
Overview
Catchment | Mallee |
---|---|
Site | Horseshoe pump site - Site 2 MA_EWW100 |
Date and Time | Saturday 8th September 2012 10:45am |
Approved | Approved |
Physical Chemical Tests
D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|
Sample | 140 | 7.6 | 0.03 | 13.8 | 88 |
Weather | overcast |
---|---|
Last rainfall | During the last week |
Flow estimate | BANKFULL: High flow within channel capacity and in-stream habitats connected |
Water Appearance | Milky |
Stream depth | >2m |
Stream width | >5m |
Hazards | |
Litter/Pollutants |
Track cut by river water flowing into creek. Heard kookaburra. Murray river very high,
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au