Waterwatch Data Portal
GB_SEV004 Seven Creeks at Twin Bridges on Brookleigh Rd
25 August 2012
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Seven Creeks at Twin Bridges on Brookleigh Rd GB_SEV004 |
Date and Time | Saturday 25th August 2012 15:15pm |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | pH pH Units | Rain mm | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|
Sample | 40 | 15 | 10.4 | 20 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | BANKFULL: High flow within channel capacity and in-stream habitats connected |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Low EC but high bankfull flow so dilute
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au