Waterwatch Data Portal
GB_LBT002 Lake Bartlett - abbatoir stormwater holding dam
10 July 2012
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Lake Bartlett - abbatoir stormwater holding dam GB_LBT002 |
Date and Time | Tuesday 10th July 2012 13:50pm |
Approved | Approved |
Physical Chemical Tests
Chem mg/L | D.O. % | D.O mg/L | E coli orgs/100mL | EC µS/cm | pH pH Units | Rain mm | rP mg/L P | Water ° C | Coli orgs/100mL | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 6 | 88 | 9.6 | 1734 | 92 | 7.2 | 0.02 | 10.5 | 2419 | 0.22 | 77 |
Weather | raining |
---|---|
Last rainfall | Raining Now 11.2 |
Flow estimate | PERMANENT: wetlands and lakes |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
water level high
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au