Site visit details

Overview

Catchment Bunyip River
Site Toomuc Creek opposite the performing arts centre at Beaconhills College ME_ETO300
Date and Time Wednesday 24th October 2012 03:30am
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 8 400 7.92 0.05 20 15 24
Weather cloudy
Last rainfall During the last week
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Stained brown
Stream depth 0 - 50cm
Stream width 2m - 5m
Hazards muddy banks
Litter/Pollutants paper,plastic
The site has had lots of heavy rain in the past months; banks are eroded.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au