Waterwatch Data Portal
ME_YDI810 Diamond Creek, Railway Pde, Eltham
20 October 2012
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Diamond Creek, Railway Pde, Eltham ME_YDI810 |
Date and Time | Saturday 20th October 2012 10:00am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.02 | 6 | 460 | 6.8 | 0.07 | 14.5 | 14.9 | 48 |
Weather | overcast |
---|---|
Last rainfall | During the last 24 hours |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | Muddy |
Stream depth | 0.8 |
Stream width | 12.0 |
Hazards | |
Litter/Pollutants | bottles,cans,paper,plastic,other |
Other litter included car tyre and orange road safety mesh. Sample water was shaken for the turbidity level. The sample water was filtered & warmed for both the phosphate & ammonium tests. Water level lower this month, hence the tyre was visible.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au