Site visit details

Overview

Catchment Dandenong
Site Hazel Vale Creek, 600 m upstream of Monbulk Creek ME_DHV010
Date and Time Tuesday 23rd October 2012 11:30am
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 10 670 7.6 0.7824 13 13 16
Weather sunny
Last rainfall During the last week 7.4
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Clear
Stream depth 51cm - 99cm
Stream width 2m - 5m
Hazards
Litter/Pollutants bottles,packets,paper,plastic,other
Dissolved oxygen test inially done with colorimeter and showed as over range so repeated test with a new sample and used titration method which gave result as above (10)

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au