Site visit details

Overview

Catchment Latrobe River
Site Footbridge @ MERA Park WG_WAH011
Date and Time Saturday 10th November 2012 13:05pm
Approved Approved

Notes

Physical Chemical Tests

D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 490 7.8 0 18 17.7 11.5
Weather sunny
Last rainfall During the last 24 hours
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Muddy,Stained brown
Stream depth
Stream width
Hazards
Litter/Pollutants plastic,other
2 shopping trolleys in creek. During the last week.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au