Site visit details

Overview

Catchment Yarra River
Site Karingal Creek, crn Susan and Brougham St, Eltham ME_YDI847
Date and Time Wednesday 14th November 2012 14:20pm
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0.9 6 670 8 0.15 20 17 60
Weather sunny
Last rainfall During the last week 9.4
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Muddy,Scummy,Oily
Stream depth 0 - 50cm
Stream width 2m - 5m
Hazards
Litter/Pollutants paper,plastic,other
Litter included a car tyre, a shoe, wood, a section of paling fence; branches and leaves. The surface was very brown-scummy, with some streaks of oil. The sample needed to be filtered for the Ammonium and Phosphate tests because the turbidity was so high. And it was necessary to dilute for the Ammonium test because the level of that was so high. The Phosphate level was relatively high too

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au