Waterwatch Data Portal
ME_YMO020 Moonee Ponds Creek at Macauley Road, Kensington. Opposite the Macauley train station
27 September 2012
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Moonee Ponds Creek at Macauley Road, Kensington. Opposite the Macauley train station ME_YMO020 |
Date and Time | Thursday 27th September 2012 10:58am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 8 | 8.4 | 0.1 | 20.3 | 16.2 | 9 |
Weather | sunny |
---|---|
Last rainfall | During the last week |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | Muddy |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants | packets,plastic |
Hi Trevor, Just wanted to let you know that we did not obtain results for the ammonium and the conductivity tests. The range of the test sample was above what could be read by the conductivity meter (the instrument displayed "OR" when immersed in sample). The ammonium sample became cloudy after the chemicals were added and left to react for 15 mins. We repeated this test, however the second sample also became cloudy after 15 mins. Thanks Vicky
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au