Site visit details

Overview

Catchment Goulburn River
Site Ruffy "Boat Hole" on Upper Hughes Creek GB_HUG003
Date and Time Wednesday 21st November 2012 08:45am
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L E coli orgs/100mL EC µS/cm pH pH Units Rain mm Air ° C Water ° C Coli orgs/100mL P mg/L Turb FTU Turb NTU
Sample 291 170 0 17 15.9 461 13
Weather sunny
Last rainfall More than a week ago
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Scummy,Stained brown,Other:
Stream depth 51cm - 99cm
Stream width 2m - 5m
Hazards
Litter/Pollutants
Water was very scummy along banks and seemed to have alot of rotting debris- perhaps from wind blowing into water?? Roadworks in area, ? if they are pumping and disturbing water.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au