Site visit details

Overview

Catchment Bunyip River
Site Sunshine Creek at outfall to Port Phillip Bay, Mt Martha ME_ESU450
Date and Time Monday 3rd December 2012 11:25am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 100 9 3200 8.5 0.02 19 13 7
Weather overcast
Last rainfall During the last 24 hours 0.2
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Clear,Stained brown
Stream depth 0 - 50cm
Stream width 1
Hazards Steep slope down to test site off roadside
Litter/Pollutants bottles,cans,packets,paper,plastic,polystyrene
Site cleaned up (half a garbage bag) - most litter seems to have washed up on high tide or been left by anglers.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au