ME_YDI810 Diamond Creek, Railway Pde, Eltham
24 November 2012
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Diamond Creek, Railway Pde, Eltham ME_YDI810 |
Date and Time | Saturday 24th November 2012 10:00am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0 | 6 | 540 | 6.7 | 0.03 | 24.3 | 19.1 | 32 |
Weather | cloudy |
---|---|
Last rainfall | During the last week |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | Muddy |
Stream depth | 0.60 |
Stream width | 10.0 |
Hazards | |
Litter/Pollutants | bottles,paper,plastic |
Litter included car tyre & road safety mesh. Sample water was filtered for phosphate & ammonium tests; shaken for the turbidity test. Creek level was much lower today.