Waterwatch Data Portal
ME_YGR023 Blackburn Lake at Heron Point opposite Naughton Gve Blackburn
5 August 2012
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Blackburn Lake at Heron Point opposite Naughton Gve Blackburn ME_YGR023 |
Date and Time | Sunday 5th August 2012 10:25am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb FTU | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.04 | 53 | 7 | 240 | 7 | 0 | 13 | 10 | 20 |
Weather | windy |
---|---|
Last rainfall | During the last week |
Flow estimate | |
Water Appearance | Clear |
Stream depth | 1m - 2m |
Stream width | |
Hazards | |
Litter/Pollutants | packets,paper,plastic,polystyrene |
Lots of wattle pollen floating on water, often mistaken for "pollution scum". Minimal litter.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au