Waterwatch Data Portal
ME_YGR020 Blackburn Lake at the Landing, a constructed platform on the edge of the lake
6 January 2013
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Blackburn Lake at the Landing, a constructed platform on the edge of the lake ME_YGR020 |
Date and Time | Sunday 6th January 2013 10:20am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb FTU | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0 | 97 | 8 | 190 | 7 | 0.01 | 24 | 24 | 44 |
Weather | sunny |
---|---|
Last rainfall | More than a week ago |
Flow estimate | |
Water Appearance | Muddy |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants | packets |
ammonia reading very low, suspect chemicals, very close to use-by, 2/2013 new chemicals for D.O. very little rubbish
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au