Waterwatch Data Portal
ME_ESU300 Sunshine Creek at Frankston school steps bridge, Mt Martha
14 January 2013
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Sunshine Creek at Frankston school steps bridge, Mt Martha ME_ESU300 |
Date and Time | Monday 14th January 2013 10:30am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 49 | 5 | 5000 | 7.1 | 0 | 20 | 13 | 20 |
Weather | cloudy |
---|---|
Last rainfall | During the last week 3.8 |
Flow estimate | POOLS: No continuous flow in channel and intermittent pools (in-stream habitats not connected) |
Water Appearance | Stained brown |
Stream depth | 0 - 50cm |
Stream width | 2m - 5m |
Hazards | |
Litter/Pollutants | bottles |
bottles removed from site. Water level in pool very low.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au