Waterwatch Data Portal
ME_DBC250 Blind Creek, 100 metres upstream of confluence of Dandenong Creek. In Boral, Scoresby.
19 October 2012
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Blind Creek, 100 metres upstream of confluence of Dandenong Creek. In Boral, Scoresby. ME_DBC250 |
Date and Time | Friday 19th October 2012 11:20am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.05 | 56 | 5.5 | 410 | 7.5 | 0.2 | 18 | 14.7 | 50 |
Weather | overcast |
---|---|
Last rainfall | During the last 24 hours 5 |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Muddy |
Stream depth | 51cm - 99cm |
Stream width | 2m - 5m |
Hazards | |
Litter/Pollutants |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au