Site visit details

Overview

Catchment Yarra River
Site Glen Waverley Main Drain. Behind 5/6 Crosby Drive, Glen Waverley ME_YSC012
Date and Time Sunday 27th January 2013 09:00am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb FTU Turb NTU
Sample 0.01 230 7.3 18.5 18.5 12
Weather overcast
Last rainfall During the last 24 hours 0.5
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Clear
Stream depth 0 - 50cm
Stream width 1.2
Hazards
Litter/Pollutants packets,paper,polystyrene

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au