Waterwatch Data Portal
ME_YGR023 Blackburn Lake at Heron Point opposite Naughton Gve Blackburn
7 May 2012
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Blackburn Lake at Heron Point opposite Naughton Gve Blackburn ME_YGR023 |
Date and Time | Monday 7th May 2012 14:30pm |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb FTU | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 70 | 7 | 160 | 7.1 | 0.015 | 13 | 13.5 | 30 |
Weather | cloudy |
---|---|
Last rainfall | During the last week |
Flow estimate | |
Water Appearance | Other: not as muddy as YGR 006 and20 |
Stream depth | 1m - 2m |
Stream width | |
Hazards | |
Litter/Pollutants | polystyrene,other |
Ammonia not tested, sample accidentally disposed of.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au