Site visit details

Overview

Catchment Yarra River
Site Blackburn Lake at Heron Point opposite Naughton Gve Blackburn ME_YGR023
Date and Time Sunday 1st July 2012 10:20am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb FTU Turb NTU
Sample 53 6 270 7.3 0.02 7 9 27
Weather raining
Last rainfall Raining Now
Flow estimate
Water Appearance Muddy
Stream depth 1m - 2m
Stream width
Hazards
Litter/Pollutants cans,packets,plastic,polystyrene
Difficult to get an accurate ammonia reading. Repeated one week later, see results 12/7/2012

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au