Site visit details

Overview

Catchment Yarra River
Site Blackburn Lake at Heron Point opposite Naughton Gve Blackburn ME_YGR023
Date and Time Thursday 12th July 2012 11:30am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb FTU Turb NTU
Sample 0.2 280 7.1 13 14 20
Weather cloudy
Last rainfall During the last week
Flow estimate
Water Appearance Other: discoloured
Stream depth 1m - 2m
Stream width >5m
Hazards
Litter/Pollutants
Water samples warmed to 20 degrees before testing. Tests repeated because of difficulty in obtaining reliable NH4 results on 1/7/2012. Very heavy flooding rain in the interval between tests

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au