Waterwatch Data Portal
ME_YSA560 Salt Creek, end of Pickwood Crt bridge
30 September 2012
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Salt Creek, end of Pickwood Crt bridge ME_YSA560 |
Date and Time | Sunday 30th September 2012 12:15pm |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0 | 9 | 570 | 8.4 | 0.05 | 14.5 | 12.3 | 19 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Shadow sampling Data
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au