Waterwatch Data Portal
GB_LKL001 Inflow to Lowanna Waters at grated entry pit
10 September 2012
Site visit details
Overview
Catchment | Broken River |
---|---|
Site | Inflow to Lowanna Waters at grated entry pit GB_LKL001 |
Date and Time | Monday 10th September 2012 13:50pm |
Approved | Approved |
Physical Chemical Tests
Chem mg/L | D.O. % | D.O mg/L | E coli orgs/100mL | EC µS/cm | pH pH Units | Rain mm | rP mg/L P | Water ° C | Coli orgs/100mL | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 95 | 8.8 | 193 | 7.8 | 0.08 | 19 | 261 |
Weather | sunny |
---|---|
Last rainfall | |
Flow estimate | PERMANENT: wetlands and lakes |
Water Appearance | Muddy,Milky |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
water level high water muddy/cloudy through whole system lots of gardening happening
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au