Site visit details

Overview

Catchment Ovens River
Site Barwidgee Creek Bruarong Catchment NE_BAR060
Date and Time Friday 11th January 2013 10:20am
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm Nitrate-Nit mg/L N pH pH Units rP mg/L P Water ° C Turb NTU
Sample 84 7 90 7.2 0.1 21.9 38
Weather sunny
Last rainfall More than a week ago
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Milky,Foamy/frothy
Stream depth 0 - 50cm
Stream width 1-Feb
Hazards
Litter/Pollutants
High NTU due to beef cattle grazing just upstream from test site. DO results obtained using Sauerstoff test kit.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au