Waterwatch Data Portal
ME_YDI810 Diamond Creek, Railway Pde, Eltham
19 January 2013
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Diamond Creek, Railway Pde, Eltham ME_YDI810 |
Date and Time | Saturday 19th January 2013 10:00am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0 | 6 | 750 | 6.8 | 0.02 | 19.6 | 20.4 | 33 |
Weather | cloudy |
---|---|
Last rainfall | More than a week ago |
Flow estimate | POOLS: No continuous flow in channel and intermittent pools (in-stream habitats not connected) |
Water Appearance | Muddy |
Stream depth | 0.5 |
Stream width | 10.0 |
Hazards | |
Litter/Pollutants | bottles,plastic,other |
Other litter included car tyre & roas safety mesh. The sample water was shaken for our turbidity test. We filtered the sample water for phosphate & ammonium tests. Water level much lower.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au