Waterwatch Data Portal
ME_EBA900 Balcombe Creek at Augusta St Bridge, Mt Martha
3 March 2013
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Balcombe Creek at Augusta St Bridge, Mt Martha ME_EBA900 |
Date and Time | Sunday 3rd March 2013 09:00am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 36 | 3 | 15700 | 7.3 | 0.03 | 23 | 23 | 0 |
Weather | sunny |
---|---|
Last rainfall | During the last week |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Stained brown |
Stream depth | 1m - 2m |
Stream width | >5m |
Hazards | |
Litter/Pollutants |
Water depth measured at 1.3 m. EC has decreased from previous months reading and the Estuary is still closed and has been since November. Upper creek flowing with rainfall since last recording of 41.3 mm
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au