Site visit details

Overview

Catchment Dandenong
Site Hazel Vale Creek, 600 m upstream of Monbulk Creek ME_DHV010
Date and Time Tuesday 5th March 2013 10:30am
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 98 9.3 1460 7.6 0.18582 23.5 18 15
Weather sunny
Last rainfall More than a week ago 21
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Clear
Stream depth 0 - 50cm
Stream width 1
Hazards
Litter/Pollutants paper,plastic

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au