Waterwatch Data Portal
ME_DHV090 Hazel Vale Creek, 10 m upstream of Monbulk Creek
5 March 2013
Site visit details
Overview
Catchment | Dandenong |
---|---|
Site | Hazel Vale Creek, 10 m upstream of Monbulk Creek ME_DHV090 |
Date and Time | Tuesday 5th March 2013 11:30am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|
Sample | 64 | 6.1 | 910 | 7.6 | 0.09128 | 21 | 18 | 10 |
Weather | sunny |
---|---|
Last rainfall | During the last week 21 |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Clear |
Stream depth | 0 - 50cm |
Stream width | 2m - 5m |
Hazards | |
Litter/Pollutants | bottles,cans,paper,plastic |
rubbish due to bank overflow from rain in late feb
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au