Waterwatch Data Portal
ME_DGE093 German Creek, at bridge to Birds Land, joins to Monbulk Creek 20 metres downstream, Tecoma
5 March 2013
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | German Creek, at bridge to Birds Land, joins to Monbulk Creek 20 metres downstream, Tecoma ME_DGE093 |
Date and Time | Tuesday 5th March 2013 12:15pm |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 52 | 4.7 | 550 | 7 | 0.22494 | 29 | 20 | 10 |
Weather | sunny |
---|---|
Last rainfall | During the last week 21 |
Flow estimate | STAGNANT: No continuous flow in channel but channel continuous (in-stream habitats connected) |
Water Appearance | Scummy |
Stream depth | 0.2 |
Stream width | 0.5 |
Hazards | |
Litter/Pollutants | packets,paper,plastic |
perhaps only just enough water for testing - water clear but had residual floating in it (noted as scummy on this test)
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au