Site visit details

Overview

Catchment Bunyip River
Site German Creek, at bridge to Birds Land, joins to Monbulk Creek 20 metres downstream, Tecoma ME_DGE093
Date and Time Tuesday 5th March 2013 12:15pm
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 52 4.7 550 7 0.22494 29 20 10
Weather sunny
Last rainfall During the last week 21
Flow estimate STAGNANT: No continuous flow in channel but channel continuous (in-stream habitats connected)
Water Appearance Scummy
Stream depth 0.2
Stream width 0.5
Hazards
Litter/Pollutants packets,paper,plastic
perhaps only just enough water for testing - water clear but had residual floating in it (noted as scummy on this test)

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au