Site visit details

Overview

Catchment Goulburn River
Site Mollison Creek at bollards near trestle bridge, Pyalong GB_MOL009
Date and Time Monday 18th March 2013 11:30am
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units Rain mm Air ° C Water ° C Turb NTU
Sample 1890 1 14.8 15.1 17
Weather overcast
Last rainfall During the last week 1
Flow estimate STAGNANT: No continuous flow in channel but channel continuous (in-stream habitats connected)
Water Appearance Stained green
Stream depth 1m - 2m
Stream width 2m - 5m
Hazards
Litter/Pollutants

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au