Waterwatch Data Portal
GB_CRE014 Creightons Creek at Longwood Mansfield Road
17 February 2013
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Creightons Creek at Longwood Mansfield Road GB_CRE014 |
Date and Time | Sunday 17th February 2013 12:00pm |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | E coli orgs/100mL | EC µS/cm | pH pH Units | Rain mm | rP mg/L P | Air ° C | Water ° C | Coli orgs/100mL | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 290 | 18 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Rainfall Jan 0 mm, then ~30mm mid Feb. Despite very variable rain, EC higher at all but one site. Turbidity higher at most sites.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au