Waterwatch Data Portal
ME_ECN100 Cannibal Creek at Pooley Rd, Tynong North
16 March 2013
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Cannibal Creek at Pooley Rd, Tynong North ME_ECN100 |
Date and Time | Saturday 16th March 2013 09:20am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 136 | 7.2 | 0.05 | 14 | 13 | 15 |
Weather | overcast |
---|---|
Last rainfall | More than a week ago 17 |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Clear,Stained brown |
Stream depth | 0 - 50cm |
Stream width | 1.8 |
Hazards | |
Litter/Pollutants | plastic,other |
N.B. Missed doing the water monitoring in early December 2012. These results above reflect the summer period. During the testing there was a very light shower. It last rained on 28/2/2013. There was Azolla sp. (like duck weed) floating on the surface of the water - almost covering the entire surface.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au