Site visit details

Overview

Catchment Bunyip River
Site Balcombe Creek at Augusta St Bridge, Mt Martha ME_EBA900
Date and Time Sunday 24th March 2013 09:00am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 45 4 3900 6.3 0.05 21 20 10
Weather sunny
Last rainfall During the last week 5
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Stained brown
Stream depth 1m - 2m
Stream width >5m
Hazards
Litter/Pollutants plastic
2 plastic cups located and glad wrap. 22.1 mls of rain over catchment since last visist. Conductivity has reduced over last 3 months as has PH. Creek entrance still closed at mouth.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au