Waterwatch Data Portal
ME_YDI810 Diamond Creek, Railway Pde, Eltham
23 March 2013
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Diamond Creek, Railway Pde, Eltham ME_YDI810 |
Date and Time | Saturday 23rd March 2013 10:00am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.02 | 6 | 700 | 7.4 | 0.025 | 18.7 | 17.3 | 55 |
Weather | overcast |
---|---|
Last rainfall | During the last 24 hours |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | Muddy |
Stream depth | 0.60 |
Stream width | 10.0 |
Hazards | |
Litter/Pollutants | bottles,cans,other |
Other litter included car tyre, blue webbing used in packaging & orange road safety mesh. The water sample was shaken for the turbidity test, filtered & slightly warmed for phosphate and ammonium tests.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au