Site visit details

Overview

Catchment Goulburn River
Site Mollison Creek at Weir Wall Power St, Pyalong GB_MOL005
Date and Time Tuesday 16th April 2013 16:00pm
Approved Approved

Notes

Physical Chemical Tests

EC µS/cm Rain mm Air ° C Water ° C Turb NTU
Sample 1350 0 16.4 18.9 20
Weather sunny
Last rainfall During the last week 1
Flow estimate STAGNANT: No continuous flow in channel but channel continuous (in-stream habitats connected)
Water Appearance Stained brown
Stream depth 1m - 2m
Stream width >5m
Hazards
Litter/Pollutants

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au