Site visit details

Overview

Catchment Yarra River
Site Koonung Creek 100m upstream of confluence with Bushy Creek ME_YKO027
Date and Time Sunday 4th December 2011 00:00am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0.03 11.6 1040 9.1 0.05 15.5 16.4 9
Weather cloudy
Last rainfall During the last 24 hours
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Clear
Stream depth 0 - 50cm
Stream width 2m - 5m
Hazards
Litter/Pollutants
Lots algea on rocks, mabe more concentrayion than last time

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au