Waterwatch Data Portal
ME_ESU300 Sunshine Creek at Frankston school steps bridge, Mt Martha
13 May 2013
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Sunshine Creek at Frankston school steps bridge, Mt Martha ME_ESU300 |
Date and Time | Monday 13th May 2013 10:15am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 80 | 8 | 2300 | 6.7 | 0.02 | 15 | 10 | 7 |
Weather | overcast |
---|---|
Last rainfall | During the last 24 hours 14.6 |
Flow estimate | HIGH: Less than bankfull and in-stream habitats connected |
Water Appearance | Milky,Foamy/frothy |
Stream depth | 51cm - 99cm |
Stream width | 2m - 5m |
Hazards | |
Litter/Pollutants | bottles,cans |
6 bottles and 1 can removed from site Turbidity tube filled to top. = 7 NTU
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au