Site visit details

Overview

Catchment Campaspe River
Site Coliban River at Todd's Bridge, Mecalfe-Taradale Rd NC_COL500
Date and Time Friday 8th March 2013 09:30am
Approved Approved

Notes

Physical Chemical Tests

EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C P mg/L Turb NTU
Sample 330 6.5 0.03 23.7 21.5 15
Weather
Last rainfall More than a week ago
Flow estimate POOLS: No continuous flow in channel and intermittent pools (in-stream habitats not connected)
Water Appearance Clear,Other: Tanin
Stream depth 1m - 2m
Stream width >5m
Hazards
Litter/Pollutants
No flow, a lot of dust and pollen on the surface of the water Spring 2012 rainfall 95mL Summer 2012/13 rainfall 29mL

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au