Site visit details

Overview

Catchment Dandenong
Site Hazel Vale Creek, 600 m upstream of Monbulk Creek ME_DHV010
Date and Time Wednesday 1st May 2013 11:15am
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 91 9.7 1250 8.1 0.11084 11 12.5 10
Weather raining
Last rainfall Raining Now 3.7
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Clear
Stream depth 51cm - 99cm
Stream width 2m - 5m
Hazards
Litter/Pollutants cans,oil,packets,paper,plastic
testing done post pollution event of 26th April - this site approx 100 metres upstream of probale dump site of contaminent (likely to be engine coolant)

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au