Waterwatch Data Portal
ME_DHV010 Hazel Vale Creek, 600 m upstream of Monbulk Creek
1 May 2013
Site visit details
Overview
Catchment | Dandenong |
---|---|
Site | Hazel Vale Creek, 600 m upstream of Monbulk Creek ME_DHV010 |
Date and Time | Wednesday 1st May 2013 11:15am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|
Sample | 91 | 9.7 | 1250 | 8.1 | 0.11084 | 11 | 12.5 | 10 |
Weather | raining |
---|---|
Last rainfall | Raining Now 3.7 |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | Clear |
Stream depth | 51cm - 99cm |
Stream width | 2m - 5m |
Hazards | |
Litter/Pollutants | cans,oil,packets,paper,plastic |
testing done post pollution event of 26th April - this site approx 100 metres upstream of probale dump site of contaminent (likely to be engine coolant)
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au