Waterwatch Data Portal
GB_TRE010 Threlful Creek at Creightons Creek
21 April 2013
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Threlful Creek at Creightons Creek GB_TRE010 |
Date and Time | Sunday 21st April 2013 12:00pm |
Approved | Approved |
Physical Chemical Tests
E coli orgs/100mL | EC µS/cm | pH pH Units | Rain mm | rP mg/L P | Water ° C | Coli orgs/100mL | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample | 140 | 7 | 16 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Rainfall: since 17/3/13 ~ 20mm in March and 0 mm in April. EC ~ the same downstream to CRE010.Higher CRE011 to 014 Turbidity lower at BAR and downstream from CRE010
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au