Waterwatch Data Portal
ME_YDI800 Diamond Creek @ Edendale Environment Centre footbridge
5 June 2013
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Diamond Creek @ Edendale Environment Centre footbridge ME_YDI800 |
Date and Time | Wednesday 5th June 2013 14:00pm |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.3 | 8 | 1100 | 0.06 | 7.3 | 14.2 | 12.2 | 200 |
Weather | overcast |
---|---|
Last rainfall | During the last 24 hours 0.1 |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | Muddy,Stained brown |
Stream depth | 0 - 50cm |
Stream width | >5m |
Hazards | |
Litter/Pollutants | bottles,packets,paper,plastic,other |
Five days ago we received 111 ml of rain over night, and there is now evidence of recent flooding where the creek depth would have been about 2m higher. The poor results for Amnonium and turbidity would be due to the recent heavy rains. Our samples required filtering, heating and Amnonium also needed diluting.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au