Waterwatch Data Portal
ME_EDV250 Devilbend Reservoir at water supply pipe, accessed from Hodgins Rd
5 May 2013
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Devilbend Reservoir at water supply pipe, accessed from Hodgins Rd ME_EDV250 |
Date and Time | Sunday 5th May 2013 10:30am |
Approved | Approved |
Physical Chemical Tests
N mg/L NH4+ | D.O mg/L | EC µS/cm | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample | 0.3 | 7 | 889 | 0 | 8.2 | 0.02 | 14.2 | 13 | 10 |
Weather | cloudy |
---|---|
Last rainfall | During the last 24 hours 5 |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Stained brown |
Stream depth | 0 - 50cm |
Stream width | 200 |
Hazards | |
Litter/Pollutants | other |
water level falling. no bird life.first test for ammonium and nitrate very windy. dead reeds visable..
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au