Site visit details

Overview

Catchment Goulburn River
Site Mollison Creek at Weir Wall Power St, Pyalong GB_MOL005
Date and Time Friday 21st June 2013 15:14pm
Approved Approved

Notes

Physical Chemical Tests

EC µS/cm Rain mm Air ° C Water ° C Turb NTU
Sample 1190 0 11.5 9.2 2
Weather sunny
Last rainfall More than a week ago
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Clear
Stream depth >2m
Stream width >5m
Hazards
Litter/Pollutants
KJH changed turbidity to 2 as an estimate as Paul could see to top of tube and recorded as zero

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au