Waterwatch Data Portal
ME_YDI847 Karingal Creek, crn Susan and Brougham St, Eltham
25 June 2013
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Karingal Creek, crn Susan and Brougham St, Eltham ME_YDI847 |
Date and Time | Tuesday 25th June 2013 15:45pm |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.03 | 8 | 830 | 7.1 | 0.08 | 14.6 | 9 | 24 |
Weather | sunny |
---|---|
Last rainfall | During the last week 1 |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | Muddy,Oily |
Stream depth | 0 - 50cm |
Stream width | 2m - 5m |
Hazards | |
Litter/Pollutants | paper,plastic |
As with the Fort Knox site … a great deal of rubbish, mainly along the banks ... most likely washed down by the mini flood at the beginning of the month. Results for the two sites were fairly simliar today, with nothing remarkable or unusual.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au