Site visit details

Overview

Catchment Dandenong
Site Dandenong Creek, at the end of the Greenway ME_DDN033
Date and Time Saturday 29th June 2013 10:55am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb FTU Turb NTU
Sample 0 7.1 0.326 10 9.9 29
Weather cloudy
Last rainfall During the last 24 hours
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Stained brown
Stream depth 51cm - 99cm
Stream width 2m - 5m
Hazards High and slippery creek banks.
Litter/Pollutants
Dissolved Oxygen (% Saturation and mg/L) tests were not conducted as there were missing directions on how to conduct the test. Electrical Conductivity test was not conducted as equipment was not calibrated and batteries were rusty.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au