Site visit details

Overview

Catchment Bunyip River
Site Cannibal Creek at Garfield North Rd, Garfield North ME_ECN300
Date and Time Monday 1st July 2013 10:30am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 325 6.7 0.03 11 9 10
Weather cloudy
Last rainfall During the last 24 hours 1
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Clear
Stream depth 0 - 50cm
Stream width >5m
Hazards
Litter/Pollutants bottles,cans
Paul Satur - Melbourne Water Waterwatch Coordinator attended. Calibrated the EC/pH meter before we did the testing. This monitoring was done about 3 weeks late. These results reflect the autumn period. No changes to the site from last time.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au