Site visit details

Overview

Catchment Goulburn River
Site Stormwater inlet into bioremediation basin - Gemmills Swamp GB_WGS001
Date and Time Monday 14th January 2013 09:30am
Approved Approved

Notes

Physical Chemical Tests

Chem mg/L D.O. % D.O mg/L E coli orgs/100mL EC µS/cm pH pH Units Rain mm rP mg/L P Water ° C Coli orgs/100mL P mg/L Turb NTU
Sample 100 36 6.4 2420 202 8.4 1.9 20.3 2420 0.52 41
Weather sunny
Last rainfall During the last 24 hours 3.6
Flow estimate PERMANENT: wetlands and lakes
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
covered in azola

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au