Waterwatch Data Portal
CO_YAR230 Yarrowee River at Kellys Bridge, Grenville
3 January 2010
Site visit details
Overview
Catchment | Barwon River |
---|---|
Site | Yarrowee River at Kellys Bridge, Grenville CO_YAR230 |
Date and Time | Sunday 3rd January 2010 11:30am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|
Sample | 70 | 6.6 | 590 | 7.5 | 0.3 | 14 | 17.7 | 10 |
Weather | overcast |
---|---|
Last rainfall | During the last week 13 |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | Clear |
Stream depth | 1.5 |
Stream width | 13 |
Hazards | unstable banks from bridge works |
Litter/Pollutants |
Bridge works commenced. Banks cleared of black berry soil arrest. Recent good flush of water through creek over past week with a lot of rain in Ballarat. Creek is goint to be wider after bridge work. P 9/10 = 0.9 mgPO4/l = 0.3 mgP/l
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au