Waterwatch Data Portal
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | kmb drain ME_EKM500 |
Date and Time | Wednesday 21st August 2013 09:40am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|
Sample | 6 | 400 | 7.6 | 0.1 | 9 | 9.4 | 60 |
Weather | overcast |
---|---|
Last rainfall | During the last 24 hours 23.8 |
Flow estimate | FLOOD / OVERBANK: flow is high and water level has exceeded bank capacity and is connecting with floodplain |
Water Appearance | Stained brown |
Stream depth | 1m - 2m |
Stream width | 2m - 5m |
Hazards | |
Litter/Pollutants |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au