Waterwatch Data Portal
ME_YDI847 Karingal Creek, crn Susan and Brougham St, Eltham
20 August 2013
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Karingal Creek, crn Susan and Brougham St, Eltham ME_YDI847 |
Date and Time | Tuesday 20th August 2013 15:45pm |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.3 | 8 | 360 | 7.3 | 0.08 | 12.1 | 11.4 | 70 |
Weather | cloudy |
---|---|
Last rainfall | During the last week 4.6 |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | Muddy,Oily |
Stream depth | 0 - 50cm |
Stream width | 2m - 5m |
Hazards | |
Litter/Pollutants | paper,plastic |
High turbidity meant that samples needed to be filtered before Ammonium and Phosphate testing. Ammonium levels were very high, indicating a dumping of some sort into the drains between here and Fort Knox (YDI 838)
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au