Site visit details

Overview

Catchment Bunyip River
Site Private Property Spring (CUM01 to Tarago group). ME_ETG001
Date and Time Saturday 15th June 2013 10:33am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb FTU Turb NTU
Sample 0.03 358 6.6 0.09 11 10.7 19
Weather cloudy
Last rainfall During the last week 80
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Clear
Stream depth 0 - 50cm
Stream width 0.05
Hazards
Litter/Pollutants
Considering the high rainfall, turbidity was quite lower than normal.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au